Albania, Extension to 400 kV of Fierza Substation and New 400 kV Interconnection Albania – Kosovo: Feasibility Study, E&S Scoping

Albania, Extension to 400 kV of Fierza Substation and New 400 kV Interconnection Albania – Kosovo: Feasibility Study, E&S Scoping

Project Description

This project aims to upgrade the Fierza substation with a new 400/220 kV phase-shift transformer and construct a new 400 kV interconnection with Kosovo. The investments include the following measures: 1) Construction of a new 400/220/110 kV substation near the Fierza substation; 2) Installation of a 400/220kV, 600 MVA phase shift transformer; 3) Identification and implementation of control, protection, monitoring, telecommunication and other measures to digitalise the Fierza substation; 4) Reconfiguration of 220 kV and 400 kV lines connecting to this substation; 5) Connection to existing interconnections 400 kV Koman – Kosova B and 220 kV Fierza – Prizren 2; 6) Connection to 110 kV transmission grid in the area; 7) Construction of a new 400 kV interconnection line between 400/220 kV Fierza substation and 400 kV Prizren 4 substation in Kosovo with ACSR 2x490/65 mm2 conductor (25 km in Albania).

The WBIF provides technical assistance for developing the feasibility study and environmental and social scoping for the project.

Partner Financial Organisations

Western Balkans Partners

Global Gateway