This project will enable the construction of a reliable electricity transmission system in Tirana and neighbouring region, towards Durres. Specifically, it will entail:
The improvements will reduce electricity losses as well as power cuts, which regularly affect 50% of the region's residents and 30% of its private businesses. Current air pollution caused by the diesel generators used during power outages is also expected to decrease.
The WBIF has allocated more than €1,100,000 as EU grant to the preparation of feasibility studies, including preliminary designs, for these two developments.
WBIF | Grant | TA3-ALB-ENE-01 | € 577,000 |
WBIF | Grant | WB4-ALB-ENE-01 | € 577,605 |
National Contribution | Own Contribution | € 11,904,262 | |
KFW | Loan | € 40,000,000 | |
WBIF | Grant | WB-IG10E-ALB-ENE-03 | € 8,018,966 |
Total | € 61,077,833 | ||
Total Grants | € 9,173,571 | ||
Total Loans | € 40,000,000 |